Solar park stone quarry, Italy, 6,16 MW

Time lapse solar park in a stone quarry, construction time 12 weeks, 3 autark time lapse setups, Italy, 2012
6,16 MW installed capacity, 26.000 polycrystalline PV modules, 7,57 GWh electrical power production per year, energy for more than 6.300 Personen, 4,5 t CO2 savings per year
16.200 (75%) post have been pre-drilled.

  • Cameras: 3
  • Tags: Solarpark, Solarfeld, solarfield